At the early stage of each project, CABA Electric conducts thorough communication to clarify goals and requirements, identify potential issues, and develop feasible solutions. The company also collects relevant data and documentation, prepares project plans and design files, and provides full project planning support to ensure smooth project initiation.
CABA Electric offers comprehensive planning services covering pre-sales support, solution design, product manufacturing, project management, quality control, installation, commissioning, and final acceptance. Our project planning helps you gain a complete understanding of project details and ensures a higher success rate.


CABA Electric provides PLC program design and robot programming based on mainstream brands such as Siemens, Allen-Bradley (AB), Schneider, and Mitsubishi. Among them, PLC program design serves as a general-purpose industrial control system built on microprocessor technology.
Using visualization software, CABA Electric designs intuitive human–machine interfaces (HMI) that clearly present the production process to operators. Real-time data updates allow you to monitor your process status at any time. The company also provides information system visualization design and consulting services to meet specific customer needs.


CABA Electric mainly offers automation and information software solutions based on PLC, Windows, and other specialized platforms, along with program design and configuration interface design. These services help customers better understand and operate software systems. Additional video resources and consulting are available upon request.
As a professional cabinet manufacturer, CABA Electric not only produces switchgear cabinets, PLC control cabinets, distribution boxes, control consoles, stainless-steel control cabinets, and control stations, but also provides complete electrical cabinet assembly services. Components comply with CE or CCC standards and are sourced from world-renowned brands such as SIEMENS, ABB, Schneider, Weidmüller, PHOENIX, Rittal, Wöhner, LAPP, Woodhead, LUTZE, and MÖLLER, meeting international quality requirements.
Customized options are available for special requests such as unique coatings, specific dimensions, or explosion-proof cabinets and consoles.



CABA Electric provides on-site industrial electrical installation services for mechanical equipment and control cabinets, ensuring systems operate as designed. The company also undertakes automation system installation, electromechanical equipment installation, and on-site commissioning.
Throughout the construction process, every operation is inspected according to engineering evaluation standards. Upon completion, CABA Electric conducts quality assessments and prepares warranty documentation to ensure that each delivered project meets design and operational requirements.